Our Past Projects

South Taylor Hill Rest Stop, Highway 97, Taylor BC

This project was completed in May 2017. The project included highway spec median curb, concrete flatwork with reinforcement, and picnic table pads.

Kildala Walkways, Kitimat BC

This project was completed in August 2017. This project included a high volume of concrete walkways. The walkways were between residential housing and required the majority of the project to be done by wheel barrow.

Ministry of Transportation and Infrastructure Project 37358 

Smithers Arterial Paving & Side Roads 2017/18

Mill and repave Hwy 16 through Smithers and New Hazelton, side road paving on rural roads in the Smithers area and pedestrian improvements on Hwy 16 in Houston.

Burns Lake Water Tower Replacement, Village of Burns Lake 2017 

Canyon Contracting Company (DBA of LB Paving Ltd)

Foundation excavation and base preparation for two new water reservoir tanks, underground piping, electrical and tie-ins to both the new tanks and existing infrastructure. Demolition and removal of the old water tank.

Upper Main Street Water Main Looping, Smithers BC 2017

Canyon Contracting Company (DBA of LB Paving Ltd)

Excavation and installation of 600 metres of new 200mm PVC water main to loop existing water supply, construction of new road base and asphalt pavement. Testing and tie ins to existing water supply infrastructure.

Ministry of Transportation and Infrastructure Project 37135 

Tyhee Lake Passing Lane 2017 

LB Paving Ltd.

Asphalt paving of approximately two kilometers of new passing lanes on Hwy 16 east of Telkwa, BC including a new, enlarged rest area and viewpoint.

Dawson Creek 8th to Rolla Road

This project was completed in June of 2016. This project included highway spec extruded barrier curb and gutter, concrete sidewalk, extruded island/median curb and coloured stamped concrete island capping.

Smithers Ambleside Subdivision

This project was completed in 2015. The project included MMCD extruded rolled curb and gutter, concrete sidewalk as well as a traffic circle.

Burns Lake Airport

Burns Lake airport was completed in August 2016 by LB Paving Ltd. for the Lake District Airport Society. This project included pulverizing the existing 1.5 km runway, regrading and adding additional crushed gravel to correct minor grade issues. The finished base was then capped with a 65mm layer of hot mix asphalt produced out of our mobile asphalt plant set up in our Walcott Gravel Pit just west of Houston, British Columbia.

Burns Lake Band Road Upgrades

Burns Lake Band Road Upgrades was started in September 2016 by Canyon Contracting Company. This project included full reconstruction of three streets in Burns Lake including new culverts, sub base, base and asphalt. The reconstruction of the roads was completed in 2016 with a seasonal shutdown in October with paving planned for spring of 2017.

LB Paving Ltd- Canyon Contracting Company - Boreal Pacific Enterprises


Mailing Address
PO Box 3513
Smithers, BC
V0J 2N0

Phone

250-847-2761

Boreal Pacific Enterprises

250-847-1850
Canyon Contracting Company

250-847-5907

Toll Free

1-800-493-2761

Email

info@lbpaving.bc.ca

Fax

250-847-2357

Summer Hours

Monday – Friday: 7:00 AM - 5:00 PM
Saturday & Sunday: Closed

Winter Hours

Monday – Friday: 8:00 AM - 4:00 PM
Saturday & Sunday: Closed


Send to a friend

Send the url of this page to a friend of yours